CTH C over E BR HONEY CREEK

3.7M E JCT CTH PF · County 111, Wisconsin · Built 1925 · 2 Lanes · 420 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
P56091500000000
Year Built
1925
Reconstructed
1964
Length
8.2 m (26.9 ft)
Max Span
7.3 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
420
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.