CTH E over BR HONEY CREEK

0.5M S JCT CTH PF · County 111, Wisconsin · Built 1963 · 2 Lanes · 271 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
P56093800000000
Year Built
1963
Length
8.2 m (26.9 ft)
Max Span
3.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
271
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.