LRD STATE LINE RD over DRY CREEK

0.8M S JCT CTH P · County 105, Wisconsin · Built 1973 · 2 Lanes · 43 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
5
Fair

Bridge Details

Structure #
P53091600000000
Year Built
1973
Length
12.5 m (41 ft)
Max Span
11.8 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
43
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$131,000
Total Project Cost
$196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.