IH 39 SB/90 EB over CMSTPP RR / SPRING BROOK
0.6M E JCT IH 43 TO S · County 105, Wisconsin · Built 2021 · 5 Lanes · 29,550 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.520556, -88.975556
This bridge is in worse condition than 16.8% of bridges in County 105. The average bridge in Wisconsin is 0 years old; this one is 5 years old.
Nearby Bridges
IH 43 NB over CP RAILROAD AND SPRING B
Built 2020
IH 39NB/90 WB over CPRR / SPRING BROOK
Built 2020
LRD CRANSTON RD over SPRINGBROOK CREEK
Built 2002
LRD CRANSTON RD over IH 90
Built 2003
IH 43 SB over IH 39 / IH 90 / STH 81
Built 2021
IH 43 NB over IH 90
Built 2021
IH 43 SB / STH 81 over IH 39 / IH 90
Built 2021
IH 43 NB / STH 81 over IH 39 / IH 90
Built 2021
IH 39 NB / IH 90 W over STH 81
Built 2021
IH 39 SB over LRD COLLEY ROAD
Built 2003
Bridge Details
- Structure #
- B53030000000000
- Year Built
- 2021
- Length
- 72.5 m (237.9 ft)
- Max Span
- 35.4 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 5
- Daily Traffic
- 29,550
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.