CTH EE W HAMPTON over LINCOLN CREEK

0.2M E JCT STH 145 · County 079, Wisconsin · Built 1956 · 4 Lanes · 20,370 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
P40053400000000
Year Built
1956
Reconstructed
2019
Length
35.3 m (115.8 ft)
Max Span
12.9 m
Width
29.8 m (97.8 ft)
Lanes
4
Daily Traffic
20,370
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.