STH 181 NB-N 76TH over STH 145-W FOND DU LAC AV
1.4M N JCT USH 41 · County 079, Wisconsin · Built 1964 · 3 Lanes · 11,400 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.114994, -88.005914
This bridge is in worse condition than 95.9% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 62 years old.
Nearby Bridges
STH 181 SB-N 76TH over STH 145-W FOND DU LAC AV
Built 1964
LRD W GRANTOSA DR over STH 145-W FOND DU LAC AV
Built 1965
LRD W GRANTOSA DR over STH 145-W FOND DU LAC AV
Built 1965
STH 181-N 76TH ST over LRD W SILVER SPRING DRIV
Built 2017
CTH E-WB SILVER SP over STH 145
Built 1964
CTH E/SILVER SPRIN over STH 145/W FOND DU LAC AV
Built 1964
LRD W VILLARD AVE over LINCOLN CREEK
Built 1956
STH 181-N 76TH ST over LRD W DOUGLAS AVE
Built 1968
LRD N 60TH ST over LINCOLN CREEK
Built 1958
CTH EE W HAMPTON over LINCOLN CREEK
Built 1956
Bridge Details
- Structure #
- B40025600000000
- Year Built
- 1964
- Reconstructed
- 2024
- Length
- 88.8 m (291.3 ft)
- Max Span
- 25.8 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 3
- Daily Traffic
- 11,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,488,000
- Total Project Cost
- $2,232,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.