STH 114-WINNECONNE over NEENAH SLOUGH
0.3M E JCT USH 41 TO N · County 139, Wisconsin · Built 1997 · 4 Lanes · 22,500 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
44.177406, -88.4812
This bridge is in worse condition than 31.7% of bridges in County 139. The average bridge in Wisconsin is 0 years old; this one is 29 years old.
Nearby Bridges
IH 41 NB over STH 114
Built 1994
IH 41 SB over STH 114
Built 1993
LRD CECIL ST over NEENAH SLOUGH
Built 2007
IH 41 NB over LRD CECIL ST
Built 1969
IH 41 SB over LRD CECIL ST
Built 1969
LRD ADAMS ST over NEENAH SLOUGH
Built 2010
LRD CECIL ST. over LRD HARRISON ST.
Built 2007
STH 114-WINNECONNE over SOO LINE RR
Built 1988
LRD CAMERON WAY over NEENAH SLOUGH
Built 2002
LRD MAIN STREET over WISCONSIN CENTRAL LTD
Built 2001
Bridge Details
- Structure #
- B70017300000000
- Year Built
- 1997
- Length
- 16 m (52.5 ft)
- Max Span
- 15.2 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 22,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.