STH 114-WINNECONNE over SOO LINE RR
0.8M E JCT USH 41 TO N · County 139, Wisconsin · Built 1988 · 4 Lanes · 13,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.180583, -88.470317
This bridge is in worse condition than 89.8% of bridges in County 139. The average bridge in Wisconsin is 0 years old; this one is 38 years old.
Nearby Bridges
LRD ADAMS ST over NEENAH SLOUGH
Built 2010
LRD MAIN STREET over WISCONSIN CENTRAL LTD
Built 2001
STH 114-WINNECONNE over NEENAH SLOUGH
Built 1997
LRD MAIN ST over NEENAH SLOUGH
Built 1977
LRD CECIL ST. over LRD HARRISON ST.
Built 2007
STH 114-COMMERCIAL over FOX RIVER
Built 1927
STH 114-COMMERCIAL over FOX RIVER
Built 1927
LRD OAK ST over FOX RIVER
Built 2006
IH 41 NB over STH 114
Built 1994
IH 41 SB over STH 114
Built 1993
Bridge Details
- Structure #
- B70010600000000
- Year Built
- 1988
- Length
- 186.4 m (611.5 ft)
- Max Span
- 22.8 m
- Width
- 19.4 m (63.6 ft)
- Lanes
- 4
- Daily Traffic
- 13,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.