CTH I | OREGON ST. over GLATZ CREEK

0.2M S JCT USH 45 · County 139, Wisconsin · Built 1977 · 2 Lanes · 7,200 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
B70008600000000
Year Built
1977
Length
6.9 m (22.6 ft)
Max Span
3 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
7,200
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.