USH 45-S MAIN ST over FOX RIVER
1.8M N JCT CTH I · County 139, Wisconsin · Built 1973 · 4 Lanes · 10,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.0128, -88.537917
This bridge is in worse condition than 66.4% of bridges in County 139. The average bridge in Wisconsin is 0 years old; this one is 53 years old.
Nearby Bridges
USH 45-S MAIN ST over FOX RIVER
Built 1973
USH 45-S MAIN ST over FOX RIVER
Built 1973
LRD OREGON ST over FOX RIVER
Built 1956
LRD OREGON ST over FOX RIVER
Built 1956
LRD OREGON ST over FOX RIVER
Built 1956
LRD WISCONSIN STRE over SHARED USE PATH
Built 2008
LRD WISCONSIN STRE over FOX RIVER
Built 2008
LRD WISCONSIN STRE over FOX RIVER
Built 2008
LRD WISCONSIN STRE over FOX RIVER
Built 2008
LRD WISCONSIN STRE over SHARED USE PATH
Built 2008
Bridge Details
- Structure #
- B70005600010000
- Year Built
- 1973
- Length
- 56.8 m (186.4 ft)
- Max Span
- 29 m
- Width
- 18.4 m (60.4 ft)
- Lanes
- 4
- Daily Traffic
- 10,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $978,000
- Total Project Cost
- $1,468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.