CTH M (NORTH AVE) over UNDERWOOD CREEK
0.1 M W JCT LILLY ROAD · County 133, Wisconsin · Built 2021 · 3 Lanes · 4,550 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
43.060642, -88.088486
This bridge is in worse condition than 23% of bridges in County 133. The average bridge in Wisconsin is 0 years old; this one is 5 years old.
Nearby Bridges
CTH M (NORTH AVE) over UNDERWOOD CREEK
Built 2021
LRD MARCELLA AVE over UNDERWOOD CREEK
Built 1968
LRD CLEARWATER DR over UNDERWOOD CREEK
Built 2008
LRD VILLAGE HALL D over UNDERWOOD CREEK
Built 1971
LRD GEBHARDT RD over DOUSMAN DITCH
Built 1966
CTH M (NORTH AVE) over UNDERWOOD CREEK
Built 1995
LRD JUNEAU BLVD over UNDERWOOD CREEK
Built 1970
LRD WATERTOWN PLAN over UNDERWOOD CREEK
Built 2016
LRD WALL STREET over UNDERWOOD CREEK
Built 2001
IH RAMP IH 41 SB T over LRD W NORTH AVE
Built 2023
Bridge Details
- Structure #
- B67037500000000
- Year Built
- 2021
- Length
- 16 m (52.5 ft)
- Max Span
- 15.2 m
- Width
- 16.7 m (54.8 ft)
- Lanes
- 3
- Daily Traffic
- 4,550
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $328,000
- Total Project Cost
- $492,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.