CTH M over THORNAPPLE RIVER

4.5M N JCT. CTH W · County 113, Wisconsin · Built 2002 · 2 Lanes · 336 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
B57007700000000
Year Built
2002
Length
7.3 m (24 ft)
Max Span
2.1 m
Lanes
2
Daily Traffic
336
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.