CTH W over THORNAPPLE RIVER

2.3M W JCT CTH M TO N · County 113, Wisconsin · Built 2003 · 2 Lanes · 678 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B57006500000000
Year Built
2003
Length
19.1 m (62.7 ft)
Max Span
9.1 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
678
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.