CTH N over EAU GALLE RIVER

0.7M E JCT CTH B · County 109, Wisconsin · Built 1961 · 2 Lanes · 538 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B55005600000000
Year Built
1961
Reconstructed
2002
Length
37.8 m (124 ft)
Max Span
14 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
538
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.