CTH II over SIMPSON HOLLOW CREEK

1.2M N JCT CTH I · County 103, Wisconsin · Built 2001 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B52024000000000
Year Built
2001
Length
10.1 m (33.1 ft)
Max Span
10.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
330
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.