CTH II over SIMPSON CREEK

0.4M N JCT CTH I · County 103, Wisconsin · Built 1995 · 2 Lanes · 1 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B52020400000000
Year Built
1995
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
1
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.