STH 56 over CAMP CREEK

1.0M E JCT STH 131 TO N · County 103, Wisconsin · Built 1975 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B52005000000000
Year Built
1975
Length
38.3 m (125.7 ft)
Max Span
15.2 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.