CTH G over CAMP CREEK

0.1M S JCT STH 56 · County 103, Wisconsin · Built 1962 · 2 Lanes · 239 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B52003300000000
Year Built
1962
Length
24.1 m (79.1 ft)
Max Span
9.1 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
239
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.