CTH HH over WISCONSIN RIVER OVRFLW

0.8M E JCT CTH E TO S · County 097, Wisconsin · Built 2006 · 2 Lanes · 8,575 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B49014000000000
Year Built
2006
Length
28.2 m (92.5 ft)
Max Span
13.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
8,575
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.