STH 66-CLARK ST over WISCONSIN RIVER 23
0.4M E JCT CTH P · County 097, Wisconsin · Built 2000 · 2 Lanes · 7,821 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.521817, -89.589664
This bridge is in worse condition than 88.5% of bridges in County 097. The average bridge in Wisconsin is 0 years old; this one is 26 years old.
Nearby Bridges
CTH HH over WISCONSIN RIVER OVRFLW
Built 2006
LRD W ZINDA DR over ROCKY RUN CREEK
Built 1971
CTH CTY HH over ROCKY RUN CREEK
Built 2006
CTH HH over WISCONSIN RIVER OVRFLW
Built 2006
CTH HH over WISCONSIN RIVER
Built 1999
CTH HH over WISCONSIN RIVER
Built 1999
IH RAMP DIVISION S over IH USH 51-IH 39
Built 1969
IH 39 SB/USH 51 SB over LRD RESERVE ST
Built 2015
IH 39 NB/USH 51 NB over LRD RESERVE ST
Built 2015
LRD N 2ND ST over IH USH 51-IH 39
Built 1969
Bridge Details
- Structure #
- B49009300000000
- Year Built
- 2000
- Length
- 165.2 m (542 ft)
- Max Span
- 41 m
- Width
- 25.8 m (84.6 ft)
- Lanes
- 2
- Daily Traffic
- 7,821
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.