STH 66 over PLOVER RIVER

0.2M E JCT CTH Y · County 097, Wisconsin · Built 1985 · 2 Lanes · 3,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B49007400000000
Year Built
1985
Length
7.7 m (25.3 ft)
Max Span
7.6 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
3,400
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.