IH USH51-IH39SB over PLOVER RIVER

1.1M S JCT STH 66 TO E · County 097, Wisconsin · Built 1969 · 2 Lanes · 16,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B49002700000000
Year Built
1969
Length
34.5 m (113.2 ft)
Max Span
14 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
16,850
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.