STH 85 over BEAR CREEK

1.0M E JCT USH 10 TO E · County 091, Wisconsin · Built 2008 · 2 Lanes · 3,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B46005500000000
Year Built
2008
Length
36.5 m (119.8 ft)
Max Span
17.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,400
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.