CTH D over EAU GALLE RIVER

1.3M W JCT STH 25 · County 091, Wisconsin · Built 1971 · 2 Lanes · 83 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
P46091200000000
Year Built
1971
Length
31 m (101.7 ft)
Max Span
15 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
83
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$273,000
Total Project Cost
$409,000