IH 43 SB-STH 32 SB over STH 57-STH 167-MEQUON RD
7.0 MI S JCT STH 60 · County 089, Wisconsin · Built 2024 · 2 Lanes · 34,300 vehicles/day
Overall
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.221467, -87.921811
This bridge is in worse condition than 31.1% of bridges in County 089. The average bridge in Wisconsin is 0 years old; this one is 2 years old.
Nearby Bridges
IH 43 NB-STH 32 NB over STH 57-STH 167-MEQUON RD
Built 2024
IH 43 over TRIBUTARY TO ULAO CREEK
Built 2024
LRD DONGES BAY RD over IH 43/STH 32
Built 2022
CTH W/PORT WASHING over IH 43/STH 32
Built 2022
CTH W/PORT WASHING over IH 43/STH 32
Built 2023
LRD HIGHLAND AVE over IH 43-STH 32-STH 57
Built 2022
LRD HIGHLAND AVE over UPRR
Built 2022
LRD COUNTY LINE RD over IH 43-STH 32-N-S FREEWAY
Built 2023
LRD HIGHLAND RD over MILWAUKEE RIVER
Built 1996
STH 57 over TRINITY CR
Built 2010
Bridge Details
- Structure #
- B45011300000000
- Year Built
- 2024
- Length
- 54.4 m (178.5 ft)
- Max Span
- 26.5 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 34,300
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $731,000
- Total Project Cost
- $1,097,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.