LRD HIGHLAND AVE over UPRR
4.1M E JCT STH 181 · County 089, Wisconsin · Built 2022 · 5 Lanes · 3,100 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
43.250461, -87.919231
This bridge is in worse condition than 9.4% of bridges in County 089. The average bridge in Wisconsin is 0 years old; this one is 4 years old.
Nearby Bridges
LRD HIGHLAND AVE over IH 43-STH 32-STH 57
Built 2022
LRD HIGHLAND RD over MILWAUKEE RIVER
Built 1996
LRD BONNIWELL RD over ULAO CREEK
Built 1987
IH 43 over TRIBUTARY TO ULAO CREEK
Built 2024
IH 43 SB-STH 32 SB over STH 57-STH 167-MEQUON RD
Built 2024
IH 43 NB-STH 32 NB over STH 57-STH 167-MEQUON RD
Built 2024
CTH C - PIONEER RD over IH 43/STH 32/57
Built 2023
CTH C PIONEER RD over ULAO CREEK
Built 1988
CTH W over ULAO CREEK
Built 1981
CTH C PIONEER RD over MILWAUKEE RIVER
Built 1988
Bridge Details
- Structure #
- B45010900000000
- Year Built
- 2022
- Length
- 35 m (114.8 ft)
- Max Span
- 33.8 m
- Width
- 35.2 m (115.5 ft)
- Lanes
- 5
- Daily Traffic
- 3,100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $560,000
- Total Project Cost
- $841,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.