STH 15 EB over WCL RR

3.4M EAST US-45 · County 087, Wisconsin · Built 2023 · 2 Lanes · 1,250 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B44028900000000
Year Built
2023
Length
86.3 m (283.1 ft)
Max Span
27.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.