STH 15 EB over CTH M

5.2M EAST US-45 · County 087, Wisconsin · Built 2023 · 2 Lanes · 12,820 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B44029100000000
Year Built
2023
Length
29 m (95.1 ft)
Max Span
27.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
12,820
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.