IH 794 WB over LRD 6TH ST
1.5M W OF STH32 · County 079, Wisconsin · Built 2008 · 3 Lanes · 22,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.035986, -87.91635
This bridge is in worse condition than 68.5% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 18 years old.
Nearby Bridges
IH 794 WB over LRD 6TH ST
Built 2008
IH-794 EB over LRD 3RD ST
Built 2006
IH 794 WB over LRD 4TH ST
Built 2008
IH 794 EB over IH 2ND ST/RAMP TO IH 43
Built 2006
IH RAMP IH 43 NB/ over LRD 2ND ST
Built 2006
IH RAMP IH 794 WB over LRD RAMP IH 794 EB TO JA
Built 2008
LRD N 6TH ST over LRD ST PAUL AVE
Built 2002
IH 794 WB over IH E-N ENTRANCE RAMP
Built 2008
IH RAMP IH 94 WB over LRD RAMP IH 794 EB - ST
Built 2006
IH-794 EB over LRD JAMES LOVELL ST
Built 2006
Bridge Details
- Structure #
- B40141200050000
- Year Built
- 2008
- Length
- 257.6 m (845.1 ft)
- Max Span
- 45.7 m
- Width
- 16.1 m (52.8 ft)
- Lanes
- 3
- Daily Traffic
- 22,100
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,251,000
- Total Project Cost
- $4,877,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.