IH-794 EB over LRD JAMES LOVELL ST

0.35 MI E OF IH-94/16TH S · County 079, Wisconsin · Built 2006 · 3 Lanes · 47,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B40131200010000
Year Built
2006
Length
296.9 m (974.1 ft)
Max Span
42.7 m
Width
15.3 m (50.2 ft)
Lanes
3
Daily Traffic
47,200
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.