IH 43 NB over LRD W HAMPTON AVE
1.1 MI N JCT STH 190 · County 079, Wisconsin · Built 2021 · 4 Lanes · 63,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.102842, -87.917669
This bridge is in worse condition than 18.2% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 5 years old.
Nearby Bridges
IH RAMP HAMPTON AV over MILWAUKEE RIVER
Built 2023
LRD N PORT WASHING over MILWAUKEE RIVER
Built 2003
IH 43 SB over LRD W HAMPTON AVE
Built 2022
IH 43 SB over LRD GLENDALE AVE
Built 2022
IH 43 NB over LRD GLENDALE AVE
Built 2023
IH 43-NB PORT WASH over LRD GLENDALE AVE
Built 2022
LRD W HAMPTON AVE over MILWAUKEE RIVER
Built 1967
LRD MILWAUKEE RIVE over MILWAUKEE RIVER
Built 2007
LRD MILWAUKEE RIVE over N BR MILWAUKEE RIVER
Built 2012
IH RAMP IH 43 SB T over IH RAMP IH 43 NB TO STH
Built 2023
Bridge Details
- Structure #
- B40101600000000
- Year Built
- 2021
- Length
- 177.5 m (582.3 ft)
- Max Span
- 39.3 m
- Width
- 22.3 m (73.2 ft)
- Lanes
- 4
- Daily Traffic
- 63,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,257,000
- Total Project Cost
- $3,386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.