LRD N PORT WASHING over MILWAUKEE RIVER

0.1M E JCT HAMPTON AVE · County 079, Wisconsin · Built 2003 · 4 Lanes · 14,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B40001000000000
Year Built
2003
Length
89.3 m (293 ft)
Max Span
29.7 m
Width
28 m (91.9 ft)
Lanes
4
Daily Traffic
14,400
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.