STH 59/GREENFIELD over IH 41/894/USH 45
0.5 MI E JCT STH 100 · County 079, Wisconsin · Built 2013 · 8 Lanes · 30,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.016278, -88.036811
This bridge is in worse condition than 18.2% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 13 years old.
Nearby Bridges
IH 41 SB/IH 894 EB over UPRR
Built 2017
IH 41 NB/IH 894 WB over CNW RR
Built 2016
IH 41/USH 45 NB/IH over LRD W SCHLINGER AVE
Built 2015
IH RAMP IH 41 NB/ over LRD W SCHLINGER AVE
Built 2015
IH RAMP STH 59-IH over LRD SCHLINGER AVE
Built 2014
IH RAMP IH 41/USH over LRD W SCHLINGER AVE
Built 2018
IH 41 SB/IH 894EB/ over LRD W SCHLINGER AVE
Built 2016
IH RAMP IH 94 EB over LRD W SCHLINGER AVE
Built 2016
IH RAMP IH 41/USH over IH RAMP STH 59 TO IH 41/
Built 2018
IH RAMP SW IH 894 over IH 94
Built 2015
Bridge Details
- Structure #
- B40076900000000
- Year Built
- 2013
- Length
- 62.6 m (205.4 ft)
- Max Span
- 32.5 m
- Width
- 41.5 m (136.2 ft)
- Lanes
- 8
- Daily Traffic
- 30,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,071,000
- Total Project Cost
- $1,607,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.