IH 41 SB/IH 894EB/ over LRD W SCHLINGER AVE
0.8 M S JCT USH 18/BLUEMO · County 079, Wisconsin · Built 2016 · 3 Lanes · 49,100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.023939, -88.036606
This bridge is in worse condition than 12.4% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 10 years old.
Nearby Bridges
IH RAMP IH 94 EB over LRD W SCHLINGER AVE
Built 2016
IH RAMP IH 41/USH over LRD W SCHLINGER AVE
Built 2018
IH 41/USH 45 NB/IH over LRD W SCHLINGER AVE
Built 2015
IH RAMP IH 41 NB/ over LRD W SCHLINGER AVE
Built 2015
IH RAMP STH 59-IH over LRD SCHLINGER AVE
Built 2014
IH RAMP IH 41/USH over IH RAMP STH 59 TO IH 41/
Built 2018
IH RAMP SW IH 894 over IH 94
Built 2015
LRD S BARNEKOW RD over DNR-HANK AARON TRAIL
Built 1989
IH 41 NB/USH 45 NB over HANK AARON STATE TRAIL
Built 2016
IH RAMP IH 41/USH over HANK AARON STATE TRAIL
Built 2017
Bridge Details
- Structure #
- B40079700000000
- Year Built
- 2016
- Length
- 25.5 m (83.7 ft)
- Max Span
- 24.1 m
- Width
- 19.3 m (63.3 ft)
- Lanes
- 3
- Daily Traffic
- 49,100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.