IH 43 SB/USH 45 SB over CTH Y (W LAYTON AVE)

0.3M S JCT IH 894 TO E · County 079, Wisconsin · Built 1966 · 3 Lanes · 38,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B40030500000000
Year Built
1966
Reconstructed
1993
Length
376 m (1233.6 ft)
Max Span
27.4 m
Width
15.2 m (49.9 ft)
Lanes
3
Daily Traffic
38,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,719,000
Total Project Cost
$7,078,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.