STH 100 SB-S 108TH over IH 43 NB

0.2M S JCT CTH Y (D) · County 079, Wisconsin · Built 1965 · 3 Lanes · 12,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B40030100000000
Year Built
1965
Length
34.4 m (112.9 ft)
Max Span
14.3 m
Width
13.9 m (45.6 ft)
Lanes
3
Daily Traffic
12,900
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$622,000
Total Project Cost
$933,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.