IH 94 EB over LRD YOUNT DRIVE

2.4 MI E JCT STH 181 · County 079, Wisconsin · Built 1958 · 4 Lanes · 79,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B40003800000000
Year Built
1958
Length
15.2 m (49.9 ft)
Max Span
14 m
Width
22 m (72.2 ft)
Lanes
4
Daily Traffic
79,000
Material
Concrete Continuous
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$245,000
Total Project Cost
$368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.