CTH W over LITTLE PESHTIGO RIVER
1.3M N JCT STH 64 · County 075, Wisconsin · Built 1920 · 2 Lanes · 1,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
45.120878, -87.8925
This bridge is in worse condition than 92.6% of bridges in County 075. The average bridge in Wisconsin is 0 years old; this one is 106 years old.
Nearby Bridges
CTH W over PESHTIGO RIVER
Built 1998
STH 64 over LITTLE PESTIGO RIVER
Built 2008
LRD FERNDALE RD over PESHTIGO RIVER
Built 1990
LRD LITTLE RIVER R over LITTLE PESHTIGO RIVER
Built 1963
LRD THIRD ROAD over BEAVER CREEK
Built 1997
CTH P over PESHTIGO RIVER
Built 1976
LRD TOWER HILL RD over LITTLE PESHTIGO RIVER
Built 2020
LRD TOWN LINE RD over LITTLE PESHTIGO RIVER
Built 1961
LRD 11TH RD over S BR BEAVER CREEK
Built 1989
LRD N 1ST RD over LITTLE PESHTIGO RIVER
Built 2020
Bridge Details
- Structure #
- B38091300000000
- Year Built
- 1920
- Reconstructed
- 1979
- Length
- 16.1 m (52.8 ft)
- Max Span
- 14.3 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,700
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $219,000
- Total Project Cost
- $329,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.