LRD FERNDALE RD over PESHTIGO RIVER

2.5M N JCT STH 64 · County 075, Wisconsin · Built 1990 · 2 Lanes · 201 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
B38004200000000
Year Built
1990
Length
53.6 m (175.9 ft)
Max Span
15.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
201
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$670,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.