LRD ERNST RD / FOR over N BR PEMEBONWON RIVER
0.75 MI WEST OF CTH O · County 075, Wisconsin · Built 1980 · 2 Lanes · 99 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
45.720217, -88.039053
This bridge is in worse condition than 80.7% of bridges in County 075. The average bridge in Wisconsin is 0 years old; this one is 46 years old.
Nearby Bridges
CTH O over N. BR. PENBONWON R.
Built 1997
LRD BARLOW LAKE RD over N BR PEMEBONWON RIVER
Built 1969
CTH N over MENOMINEE RIVER
Built 1973
M-95 over MENOMINEE RIVER
Built 1973
US-141 over MENOMINEE RIVER
Built 2011
USH 141-ROOSEVELT over MENOMINEE RIVER
Built 2011
USH 8-USH 141 over LRD CRAIN LANE
Built 1970
USH 8-USH 141 over S BR PEMEBONWON RIVER
Built 1970
CTH R over S BR PEMEBONWON RIVER
Built 1993
USH 8 over MENOMINEE RIVER
Built 1965
Bridge Details
- Structure #
- B38015100000000
- Year Built
- 1980
- Reconstructed
- 2019
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 99
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $95,000
- Total Project Cost
- $143,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.