CTH N over MENOMINEE RIVER

2.0M E JCT CTH B · County 037, Wisconsin · Built 1973 · 2 Lanes · 3,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B19000300000000
Year Built
1973
Length
100.3 m (329.1 ft)
Max Span
27.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,300,000
Total Project Cost
$1,950,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.