IH USH 51-IH 39 SB over STH 153

8.8M S JCT STH 29 TO E · County 073, Wisconsin · Built 1973 · 2 Lanes · 29,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B37014800000000
Year Built
1973
Reconstructed
2015
Length
51 m (167.3 ft)
Max Span
25.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
29,800
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$689,000
Total Project Cost
$1,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.