STH 153-MAIN ST over WISCONSIN RIVER 25

0.2M E JCT CTH B · County 073, Wisconsin · Built 1963 · 2 Lanes · 13,100 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
B37009700000000
Year Built
1963
Length
8.2 m (26.9 ft)
Max Span
3 m
Lanes
2
Daily Traffic
13,100
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.