LRD REVERE DR (SB) over MANITOWOC RIVER
0.9M S JCT USH 10 · County 071, Wisconsin · Built 1984 · 2 Lanes · 14,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
44.096642, -87.674225
This bridge is in worse condition than 50.2% of bridges in County 071. The average bridge in Wisconsin is 0 years old; this one is 42 years old.
Nearby Bridges
LRD NORTH 21ST STR over MANITOWOC RIVER
Built 1990
LRD 18TH ST over LRD SPRING ST CONNECTOR
Built 1978
STH 42 over MANITOWOC RIVER
Built 1987
STH 42 over MANITOWOC RIVER
Built 1987
STH 42 over MANITOWOC RIVER
Built 1987
USH 10 WB-8TH STRE over MANITOWOC RIVER
Built 1995
USH 10/WALDO BLVD over WISCONSIN CENTRAL RR
Built 1975
USH 10/WALDO BLVD over DRY RUN
Built 2020
LRD BROADWAY STREE over MANITOWOC RIVER
Built 1984
USH 10 E over MANITOWOC RIVER
Built 1980
Bridge Details
- Structure #
- B36012200000000
- Year Built
- 1984
- Length
- 92.5 m (303.5 ft)
- Max Span
- 30.7 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 14,600
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,547,000
- Total Project Cost
- $2,321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.