LRD 18TH ST over LRD SPRING ST CONNECTOR
0.7M S JCT USH 10 · County 071, Wisconsin · Built 1978 · 4 Lanes · 14,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.099269, -87.671975
This bridge is in worse condition than 80.1% of bridges in County 071. The average bridge in Wisconsin is 0 years old; this one is 48 years old.
Nearby Bridges
LRD REVERE DR (SB) over MANITOWOC RIVER
Built 1984
LRD NORTH 21ST STR over MANITOWOC RIVER
Built 1990
STH 42 over MANITOWOC RIVER
Built 1987
STH 42 over MANITOWOC RIVER
Built 1987
STH 42 over MANITOWOC RIVER
Built 1987
USH 10/WALDO BLVD over WISCONSIN CENTRAL RR
Built 1975
USH 10 WB-8TH STRE over MANITOWOC RIVER
Built 1995
USH 10/WALDO BLVD over DRY RUN
Built 2020
LRD BROADWAY STREE over MANITOWOC RIVER
Built 1984
USH 10/MARITIME DR over LITTLE MANITOWOC RIVER
Built 1991
Bridge Details
- Structure #
- B36010600000000
- Year Built
- 1978
- Reconstructed
- 2010
- Length
- 199.6 m (654.9 ft)
- Max Span
- 19.8 m
- Width
- 20.4 m (66.9 ft)
- Lanes
- 4
- Daily Traffic
- 14,600
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,256,000
- Total Project Cost
- $4,884,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.