STH 16 over MILLER COULEE/PED. TRAIL

1.2M E JCT STH 35 · County 063, Wisconsin · Built 1981 · 4 Lanes · 15,850 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
B32010000000000
Year Built
1981
Length
10.2 m (33.5 ft)
Max Span
2.6 m
Lanes
4
Daily Traffic
15,850
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.