USH 53 SB - COPELA over CMSTPP RR / ST ANDREW ST
2.3M S JCT IH 90 (A) · County 063, Wisconsin · Built 1983 · 2 Lanes · 11,110 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.832761, -91.247775
This bridge is in worse condition than 15.7% of bridges in County 063. The average bridge in Wisconsin is 0 years old; this one is 43 years old.
Nearby Bridges
USH 53 NB-ROSE ST over CMSTPP RR-ST ANDREW ST
Built 1980
STH 35-LANG DR over LA CROSSE RIVER
Built 1982
STH 35-GEORGE ST over CMSTPP RR
Built 1962
CTH B / CLINTON ST over BLACK RIVER
Built 1981
CTH B - CLINTON ST over RICHMOND BAY
Built 2004
USH 53-COPELAND AV over LA CROSSE RIVER
Built 1987
LRD GATEWAY ACCESS over BN RR
Built 1989
LRD GILLETT ST over CNW RR
Built 1989
LRD NAKOMIS AVE (D over BLACK RIVER SLOUGH
Built 1987
LRD S PETTIBONE DR over PETTIBONE SLOUGH
Built 1931
Bridge Details
- Structure #
- B32008600000000
- Year Built
- 1983
- Length
- 79.6 m (261.2 ft)
- Max Span
- 26.3 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 11,110
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,341,000
- Total Project Cost
- $2,012,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.