CTH W over JOHNSON COULEE CREEK
0.2M E JCT CTH D · County 063, Wisconsin · Built 1952 · 2 Lanes · 1,530 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
43.967717, -91.202583
This bridge is in worse condition than 95.6% of bridges in County 063. The average bridge in Wisconsin is 0 years old; this one is 74 years old.
Nearby Bridges
CTH D over HALFWAY CREEK
Built 2024
LRD KNUDSON RD (DE over HALFWAY CREEK
Built 1972
CTH M over HALFWAY CREEK
Built 2021
LRD CASBERG COULEE over LONG COULEE CREEK
Built 2024
CTH DH MAIN ST over HALFWAY CREEK
Built 1991
CTH V over LONG COULEE CREEK
Built 2020
CTH HD over HALFWAY CREEK
Built 1990
CTH SN over BR SAND LAKE COULEE CRK
Built 2019
USH 53 NB over STH 35 NB/S. HOLMEN DRIV
Built 1990
USH 53 SB over STH 35 NB/S. HOLMEN DRIV
Built 1990
Bridge Details
- Structure #
- B32000100000000
- Year Built
- 1952
- Length
- 12.6 m (41.3 ft)
- Max Span
- 12.6 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,530
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $183,000
- Total Project Cost
- $274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.