CTH V over LONG COULEE CREEK
1.5M N JCT CTH D · County 063, Wisconsin · Built 2020 · 2 Lanes · 4,700 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 9 | Excellent |
Location
43.9878, -91.255633
This bridge is in worse condition than 10.8% of bridges in County 063. The average bridge in Wisconsin is 0 years old; this one is 6 years old.
Nearby Bridges
LRD CASBERG COULEE over LONG COULEE CREEK
Built 2024
CTH V over LONG COULEE CREEK
Built 1966
USH 53 NB-STH 35 N over LRD OLD CTH NA
Built 1992
USH 53 SB-STH 35 S over LRD OLD CTH NA
Built 1992
USH 53 NB over STH 35NB/CTH HD
Built 1992
CTH DH MAIN ST over HALFWAY CREEK
Built 1991
USH 53 SB over STH 35NB/CTH HD
Built 1992
USH 53 NB-STH 35 N over CTH MH
Built 1992
USH 53 SB-STH 35 S over CTH MH
Built 1992
CTH HD over HALFWAY CREEK
Built 1990
Bridge Details
- Structure #
- B32023700000000
- Year Built
- 2020
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 4,700
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.