CTH KB over BLACK CREEK
0.1M E JCT CTH V · County 061, Wisconsin · Built 1946 · 2 Lanes · 975 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
3
Serious
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 3 | Serious |
| Substructure | 4 | Poor |
Location
44.356056, -87.742028
This bridge is in worse condition than 98.9% of bridges in County 061. The average bridge in Wisconsin is 0 years old; this one is 80 years old.
Nearby Bridges
LRD BOLT RD over BLACK CREEK
Built 1978
LRD LANGES CORNER over BLACK CREEK
Built 1986
LRD CURRAN RD over BLACK CREEK
Built 1993
CTH BB over BUCK CREEK
Built 2002
LRD OLD SETTLERS R over BLACK CREEK
Built 2021
CTH BB over NESHOTA RIVER
Built 2015
CTH KB over NESHOTA RIVER
Built 1948
LRD ZANDER RD over NESHOTA RIVER
Built 2004
LRD MARIBEL RD over NESHOTA RIVER
Built 1971
LRD CTH BB over JAMBO CREEK
Built 2011
Bridge Details
- Structure #
- B31089300000000
- Year Built
- 1946
- Length
- 12.6 m (41.3 ft)
- Max Span
- 12.6 m
- Width
- 8.1 m (26.6 ft)
- Lanes
- 2
- Daily Traffic
- 975
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $183,000
- Total Project Cost
- $274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.